You want a swimming pool, but the cost of a complete installation makes you hesitate. What if you took on part of the construction work yourself? That’s the whole point of the kit-style pool: you can buy a set designed to be assembled on site, then choose the interventions you entrust to professionals.
The question remains of where to place the cursor. Between assembling a few panels and building an entire underground pool from start to finish, there is a huge difference. Here's how to divide up the work before even signing your quote.
Start with the plan, not with the shovel
The first task does not require a concrete mixer or a drill. It involves choosing the location of the pool, checking the constraints of the terrain, and defining the necessary space around the pool. Consider the path between the house and the pool, the future technical area, and the traffic of vehicles during the construction.
You can materialize the envisioned dimensions with ropes and stakes. Take a walk around this imaginary pool with a chaise longue in hand. You will quickly see if the passage is comfortable or if you have planned a pool that is too large for the garden.
Attention, this first drawing does not replace the execution plan provided by the manufacturer. The dimensions of the excavation are not those of the water surface.
Before ordering, check with your local municipality. For a non-covered, above-ground swimming pool of more than 10 m² and up to 100 m², a preliminary declaration is usually required. Specific rules may apply depending on the sector and coverage. The site Public Service, verified file on January 31, 2025, It details these procedures and the security obligations.
The groundwork: often the first post to be delegated
Digging yourself can seem economical, especially if a friend knows how to drive a mini-excavator. But you also need to obtain the correct depth, respect the intended profile, manage the soil, and protect existing networks. Not to mention the risks associated with the walls of the excavation and the stability of the ground.
For a basin of 7 × 3.5 meters, the volume of a simple rectangle 1.5 meters deep already represents 36.75 m³. The actual volume of the construction site will be different depending on the shape, the necessary clearances, and the nature of the terrain. Once extracted, the soil can take up more space.
Therefore, ask for a separate quote from a landscaper, including the removal of debris if necessary. On a sloping, wet or clay soil, have the solution validated by competent professionals before starting.
Our article on the volume of earth to be removed during a pool excavation It will help you prepare for this discussion.
The assembly of the structure: where the kit makes sense
Some kits use prefabricated metal panels, others use blocks that must be assembled before the concrete is poured. These are not the same actions, the same tools, or the same labor requirements.
The panels designed for mechanical assembly can be interesting if you like to tinker with precision. You work from a manual that is adapted to the model, with elements prepared in the factory. This does not exempt you from checking the levels, alignment, and all the assembly requirements.
The manufacturer Waterair, for example, presents the construction steps for its models on its website. page dedicated to kits for swimming pools. This is an example of a constructive system, not a universal procedure applicable to all kits.
If you are undecided between two techniques, please also consult our comparison of kits made of steel panels and blocks of polystyrene.
The bottom of the basin: do not underestimate the precision
Depending on the system chosen, the manufacturer may prescribe a slab, a screed, or another foundation solution. These elements are not interchangeable. A friend who knows how to pour a terrace slab may not necessarily have the necessary experience to build the foundation for your pool.
If you are proficient in masonry and have the appropriate equipment, some operations can be carried out by yourself, following the technical documentation. If in doubt, ask a mason familiar with swimming pools for a targeted service. A lack of flatness or a level error can complicate several subsequent steps.
Filtering, sealing and electricity: choose your limits
You can participate in the preparation of the technical area or in certain hydraulic operations provided for in the manual if you have the necessary skills. Have the installation and its tightness checked before the pipes become inaccessible.
For electrical connections near water, you should hire a qualified electrician. This is not a job that can be done by an amateur based on a video.
The installation of the liner also deserves some thought. Depending on the model and the warranty conditions, the manufacturer may offer or impose the use of specialized intervention. Ask specifically who is performing this step, who is responsible for commissioning, and what happens if a defect appears.
Finishes: a good way to spread the budget
Arranging the borders, installing outdoor storage, preparing the plantings, or carrying out certain finishing touches compatible with the chosen system are tasks that you may consider leaving to yourself.
It is sometimes possible to postpone part of the decorative landscaping for the following season. However, do not postpone the work necessary for stability, protection of the basin, or safety. The regulatory device for preventing drowning must be planned from the outset, and swimming should not begin until the installation is safe.
How much can one save by participating in the construction project?
Good calculation consists of comparing two identical scope estimates. Let’s take an example: a professional installation costing 5,000 euros and a participatory formula costing 2,000 euros. If you need to add 700 euros for rental of tools, consumables and transport, the gross savings become 2,300 euros. These are not market rates, but a calculation method.
Also add your availability. If you need to take several days of unpaid leave, that’s part of the project cost. And plan for the unexpected.
Some providers offer several levels of support. accompaniment formulas presented by Waterair They illustrate this possibility of choosing between personal assembly, occasional assistance and professional installation.
Questions to ask before signing
Request a written list of the work included and excluded, the supplies to be purchased separately, the necessary tools, and the mandatory interventions. Check the warranty conditions, the insurance policies of the involved companies, and the responsibilities of each party. Also identify the control steps before tiling or putting the water in, and the contact details of the technical support.
You don’t need to become a pool builder to enjoy the benefits of a ready-made pool. The advantage is precisely being able to choose your level of involvement. Keep the tasks you know how to perform properly, entrust the delicate operations to competent people, and compare the total cost of the ready-to-use pool. You will thus have a much more realistic vision of the project than that given by the price of the carton delivered to your garage alone.