You want a swimming pool, but not necessarily a big bill that hurts all at once. The pool quote is reasonable, then come the terrace, the heating, the plantings and the equipment. All added up, the project exceeds your budget. Should we wait another two years? Not necessarily.
Building your pool in two stages can help spread out the costs. The principle is to finish a usable and safe pool first, then add on the finishing touches when the budget allows. But for that to work, you need to plan for both stages before even starting the digging.
Start with a complete pool, not with a project that is only half finished
The first stage must include everything necessary for the functioning of the basin: the necessary studies, the foundation, the structure, the sealing, the connections, the filtration, the water treatment and the appropriate safety equipment. The surrounding areas must also allow for safe movement without compromising the stability or protection of the basin.
Therefore, it is not enough to fill a pool surrounded by open trenches, thinking that the family will take care of it. The work that affects the strength, tightness, or safety of the pool must be completed before enjoying the water.
The second step may involve comfort and decoration: a larger terrace, a pergola, a dining area, planting, or even a heating system that you don’t consider essential for the first summer.
Make two columns in your budget
Imagine a project costing 28,000 euros. You have 21,000 euros available today. Instead of eliminating services without knowing what they entail, ask for a quote divided into two lots.
In this fictitious example, the first lot includes the basin and its landscaping for 15,000 euros, the technical equipment and connections for 3,000 euros, the security for 1,500 euros and the necessary landscaping for 1,500 euros. Total: 21,000 euros. The second lot includes an extension of the terrace for 3,500 euros, a heating system for 2,500 euros and landscaping for 1,000 euros. Total: 7,000 euros.
These amounts are not market prices: they illustrate a distribution method. Your quote will depend, in particular, on the land, the chosen basin, the region, and the work involved. And if your 21,000 euros represent all your available savings, also allow for a margin for unforeseen expenses rather than spending every euro right from the start.
Once the two columns are filled out, add the expenses that are not necessarily included in the contract: applicable taxes, ancillary fees, and initial operating costs. Our article dedicated to Complete budget for a swimming pool beyond the basin It helps to do this work.
Prepare now what you will install later
You dream of a heat pump but prefer to wait for a season? Ask during the first quote how to prepare your future location, your power supply and the necessary connections. You must take into account the requirements of the equipment ultimately chosen. A poorly placed booking can be just as frustrating as a forgotten booking.
The same reasoning applies to outdoor lighting, any motorized equipment, and terrace extensions. Have a plan drawn up of the wiring and keep it with the photographs taken before the concrete was poured. A few years later, knowing where the pipes run is particularly useful.
Also consider the levels of the final terrace. The edges, slopes, exits, and thresholds must be compatible with the cladding you are considering. Do not have a temporary support installed that will have to be removed when a final preparation would have been possible.
The positions for which you can wait
Heating is often an interesting option. If your family mostly takes baths in July and August, you can observe the water temperature in the pool during the first season before choosing a device. Our comparison solar heating or heat pump presenting the two solutions.
The garden’s decoration can also wait. After a few months, you’ll know better where to place the sun loungers, which areas lack shade and which paths are actually used. You may avoid paying for a large beach when only half of it is never used.
A more sophisticated cover can be considered at a later date if an appropriate safety device is already in place and remains effective during the work. A comfort cover should not be confused with equipment that meets safety requirements.
Administrative procedures are not decided randomly
Doing the work in two stages does not allow you to circumvent the urban planning rules. Present the complete project to the competent department of your town hall, especially if you plan to build a shelter or an annex. Public Service sheet on the construction of a swimming pool, verified on January 31, 2025, details the formalities according to the characteristics of the project and recalls the applicable safety obligations.
Also anticipate the tax declaration. According to the Official document on the effects of new constructions on local taxes, The land declaration must be submitted within 90 days after the completion of the relevant works. Do not assume that the absence of a decorative terrace allows you to defer this obligation. In case of doubt about a subdivided construction site, contact the tax authorities.
Does a kit-based swimming pool make it easier to cut the budget?
It can be of interest if you want to take on certain work yourself or to entrust it to different artisans. But be aware of what the kit price covers: delivery, groundwork, additional materials, connections and installation are not always included.
Before committing yourself, read our guide on work that can be done yourself with a kit pool. Ask who is responsible for each intervention and what conditions must be met to benefit from the guarantees. If the technical work exceeds your skills, an established formula or a shell may be more suitable. A masonry construction can also perfectly integrate into a progressive development program.
The second construction project may cost more than expected
Two interventions can lead to two displacements, additional deliveries, or a new mobilization of artisans. The rates for the second year may also change. Ask if the vehicles will still be able to access the garden once the basin is completed and if the work risks damaging the existing landscaping.
So compare the overall cost of the two solutions, in one go and in several stages. Shifting the expenses does not automatically mean making savings. You can simply achieve a better financial distribution, which is already useful.
Before signing, ask for a complete quote, two clearly-priced lots, and a list of preparations to be carried out immediately. If the first phase allows for a safe, functional pool that is compatible with future work, the project is worth considering. You can enjoy your pool without having to complete all the garden decoration that same summer.