You have found the right location for your future pool. The sun arrives in the morning, the sun loungers will have their place and you have even started to think about the color of the liner.
There's still a lot of digging to do. Except that your plot has a small peculiarity. In summer, the soil becomes hard like concrete. After several days of rain, it sticks to your shoes and turns your garden into a veritable skating rink.
Welcome to clay soil. This is not necessarily a problem for building a swimming pool. Many homeowners have a pool on this type of soil.
But there are a few precautions to take. Because unlike your garden patio, a buried swimming pool doesn’t appreciate it when the ground moves around it.
Why clay soil can be a problem
Clay has a rather surprising property: it changes in volume depending on the amount of water it contains.
When it dries, it shrinks. When it rehydrates, it can swell. This phenomenon has a name: the clay shrinkage-swelling phenomenon.
Imagine an eraser that slightly changes its size depending on whether it is dry or wet. This isn’t exactly the same process, but the image helps to understand what’s happening under your feet.
The problem appears when these movements are not uniform. Part of the ground may settle more than another part. On a house, this can cause cracks.
For a swimming pool project, these movements must be taken into account in the sizing and design of the pool, its foundations and its connections.
The Bureau of Geological and Mining Research, BRGM, explains that these variations can damage structures when they are not adapted to the terrain.
That doesn’t mean your pool will necessarily crack. It simply means that you need to know the terrain before building. And that’s where some projects start a bit too quickly.
First thing to do: look at the new risk map
Before calling a landscaping company, take a few minutes to check the website. Geologically dangerous.
This public service allows, among other things, to know the extent to which a plot of land is exposed to the swelling of clays. You can search for your address there. The map distinguishes different levels of exposure.
In 2026, it underwent a significant update. An order of 9 January 2026 formalized a new zoning regime, which has been applicable since 1 July 2026 for the sale of undeveloped land for development and for the construction contracts for individual houses concerned.
According to the Ministry of Ecological Transition, the medium and high exposure zones now represent 55% of the hexagon territory, This is up from 48% in the 2020 map. In other words, the issue affects many gardens.
Attention, the map does not replace a study of your terrain.
This is an important point. The Georisques map provides information about the exposure of a sector. It does not constitute an accurate diagnosis of the soil at the exact location of your future pool.
The BRGM specifies that the mapping is based, in particular, on geological data at the 1/50,000 scale. Therefore, local differences may exist.
Your neighbor may have encountered clay at a shallow depth while your soil has a different composition.
The card constitutes a first indicator. Not a guarantee.
And the soil study, is it mandatory?
You may have heard about the G1 and G2 geotechnical studies. These studies are used to characterize the soil and, depending on their nature, to define the necessary provisions for a construction project.
The regulations related to the Élan Act provide for specific obligations for the sale of certain buildable land and the construction of individual houses in exposed areas.
But be careful not to confuse the situations. These obligations do not mean that a G2 study is automatically required for any private swimming pool.
The applicable rules depend on the nature of the project and its context.
Conversely, a suitable geotechnical study can be particularly useful when a site presents risks of movement, sedimentation or the presence of water.
It allows the professional to have more reliable information to design the work. This is, in particular, what the technical documentation published by industry professionals recommends.
And if your pool builder tells you that he knows the area perfectly without even having examined it, ask some questions. That doesn’t necessarily mean anything bad. But he should be able to explain what information he’s basing his assessment on.
The groundwork: when the weather decides the program
Imagine that your construction project starts in November. The company arrives with its mini-excavator. It has rained all week. The soil is heavy, sticky, and the wheels of the machinery are already starting to make deep marks in the garden.
Should we continue? Not necessarily.
Very wet clay soil can become difficult to work with. Tractors can damage the bottom of the trench, cause ruts, or complicate the preparation of a regular seat.
Conversely, very dry soil can become particularly difficult to excavate. The time chosen for the work can therefore have an impact on its progress.
This does not necessarily mean that construction must take place in the spring. It is especially important to take into account the actual state of the ground and the conditions of the construction site.
We had already addressed this issue in our article on Landscaping a swimming pool in the rain.
The advice remains the same: it is better to postpone a step when conditions compromise its proper execution than to have to resume work a few weeks later.
Draining: the water must be able to go somewhere
This is probably one of the most important issues on clay-based soil. The clay can be poorly permeable. Water then circulates very slowly in certain layers of the soil.
After heavy rainfall, it can accumulate around an excavation. And when an underground pool is installed, this external water must be taken into account.
Professionals can install a peripheral drainage system, a collection device, or a well to monitor the presence of water around the basin.
But beware: Installing a drain is not enough if the collected water cannot be properly drained away.
An appropriate and authorized drainage system is required. The solution depends, among other things, on the slope of the terrain, the evacuation possibilities, and the possible presence of groundwater.
A professional guide dedicated to the excavation and drainage of swimming pools, published in September 2026, reminds that drainage does not replace a soil stability study.
This is an essential distinction. A drain can manage part of the problems related to water. It does not, on its own, transform an unstable soil into a solid foundation.
Is a shell pool likely to rise?
This is a question that comes up regularly. You have probably already seen photographs of partially dug-out pool shells. The result is quite spectacular.
But this phenomenon does not only affect clayey soils; it is also linked to the pressure exerted by the water present outside the basin.
A full pool opposes its weight to certain forces. When it is drained, the conditions change.
If groundwater exerts significant pressure, an insufficiently designed or protected basin can undergo deformations or movements.
That is why manufacturers and installers provide for special arrangements depending on the conditions of the terrain.
A decompression well can, in particular, allow the level of the external water to be monitored.
The technical documentation from Piscines Waterair emphasizes the preparation of the excavation foundation, drainage, and water control devices for installations on clay-based soil.
In practice, never completely empty your pool without checking the manufacturer's instructions and the hydrogeological conditions.
A complete drain-off is not just an ordinary maintenance task; it can change the constraints placed on the structure.
Concrete, shell or kit: which one is the best?
It would be tempting to name a big winner. Concrete would definitely be stronger. The hull would definitely be more flexible. And the kit would definitely be more fragile. But things aren’t that simple.
A properly sized concrete pool can be adapted to a clay soil. A shell can also be installed on this type of ground when the installation conditions and the manufacturer's specifications are met.
Some kits are also designed for different types of terrain.
What matters is the compatibility between the structure, the characteristics of the soil, and the construction methods.
An excellent pond in a stable terrain can encounter problems if it is installed on an unsuitable foundation.
Before choosing, ask the professional to specify how he/she plans to manage the constraints of the terrain. And above all, be sure to specify the arrangements included in the quote.
Our comparison of concrete pools, shell and kit It will help you understand the differences between these structures.
Also pay attention to trees and pipes
Do you have a large oak tree in the back of the garden? It provides good shade. But on clay soil, vegetation can locally affect the water content of the soil.
Roots absorb moisture. And differences in humidity can contribute to soil movement.
The BRGM identifies, among other things, vegetation near buildings as a factor that could exacerbate some phenomena of subsidence-inflation.
This does not mean that all trees must be felled before construction begins. The distance, the species, the root development and the nature of the soil must be evaluated.
Even caution is needed with buried pipes. A leak can locally moisten the ground. On sensitive soil, this modification can have consequences.
Therefore, consider the location of the networks, their accessibility, and the management of rainwater.
Questions to ask before signing the quote
You have found a company and the project is starting to take shape. Before signing, take a few minutes to check the following points.
- Has the nature of the terrain been assessed? Ask how the professional identified the characteristics of the soil and whether further study is necessary.
- How will the pool bench be prepared? The materials, foundations and any reinforcements must be adapted to the project.
- What is planned for outdoor water? Ask if drainage or a control device is needed, and where the water will be discharged.
- Are connections and surrounding areas taken into account? The pipes, the curbs and the terrace must be compatible with the constraints of the terrain.
- What exactly does the price include? Check the planned benefits and any adjustments that may result in an additional charge.
These questions allow companies to compare themselves with each other in terms of more than just the final price of the quote.
You can also consult our article dedicated to Things to check before signing with a pool attendant.
Loamy soil does not prevent enjoying a swimming pool
If your garden is located in an area exposed to clay-slump erosion, there is no need to abandon your project immediately. Simply avoid treating the terrain as a minor detail.
Start by consulting Géorisques. Have the construction conditions examined. And choose a solution adapted to the real characteristics of the soil.
A well-designed swimming pool starts from the bottom. Even after the work is finished, everyone will mainly look at the color of the water.
As for the dog that left its footprints on the construction site plans, perhaps it will be necessary to explain to it that its opinion does not replace a geotechnical study.
Sources and references
- Geologically dangerous : Mapping and dossier on the clay swelling phenomenon, updated 2026.
- BRGM : geological mapping, withdrawal-inflation mechanisms and prevention.
- Ministry of Ecological Transition New zoning of clay risk areas and regulations for construction.
- Waterair swimming pools Technical advice for preparing clay soil, drainage and water control.