Building your swimming pool in Luxembourg

Procedures for building a private swimming pool in Luxembourg

Your private swimming pool in Luxembourg

Dreaming of building a swimming pool in your Luxembourg garden? There are a number of administrative formalities that need to be completed before you can take the plunge. Don't panic: here's a mini-guide in a few points clarifying formalities and simplify your procedures. In the following lines, you will discover :

  • The necessary authorisations (planning permission or not?)
  • Documents to be provided to build a solid case
  • Timeframes to avoid any unpleasant surprises

Throughout this article, we'll also be giving you a few tips for save time and making it easier for you to do business. Ready to get started? Then follow the guide.

The necessary authorisations

Planning permission or simple authorisation?

  • In-ground or semi-in-ground pool Planning permission: in most cases, you will need planning permission. You can apply for this at your local planning office.
  • Above-ground pool It all depends on the size and duration installation. Small demountable pools, installed for just a few months, sometimes require a simple declaration. If in doubt, always check with your local council.

How do you know what applies to your project?

  • Find out more locally Each municipality in Luxembourg can lay down specific rules (distance from neighbours, height of fences, etc.).
  • Study surface and depth thresholds Planning permission is often required for swimming pools larger than 20 m² and more than 1 m deep.
  • Think about equipment If you are planning a large technical room or a shelter that alters the overall view, this may justify additional planning permission.

If in doubt, contact urbanism department of your local authority. They will be able to confirm whether you need a permit or just a simple authorisation. That's the best way to avoid unpleasant surprises!

Documents to be supplied

Prepare your pool construction file

To obtain your planning permission in Luxembourg, you'll need to put together a solid file. Here are the key points to bear in mind:

  1. Location map
    • Show the precise location of your future swimming pool on your plot.
    • Clearly indicate the distance from the house and the boundaries of the plot.
  2. Detailed plan of the pool
    • Pool dimensions (length, width, depth).
    • Specification of materials (concrete, polyester hull, etc.).
    • If you have a machine room or shelter, show its location.
  3. Photos or illustrations
    • Include current photos of your garden.
    • You can add a 3D visual of the swimming pool to help the local authority plan ahead.
  4. Descriptive note
    • Describe your project: why this swimming pool, what materials, how will it fit in with the environment?
    • Mention your security devices (shutters, alarm, barrier, etc.).
  5. Administrative documents
    • Copy of your title of ownership or certificate if you are a tenant.
    • Forms specific to the municipality (some require a standard form).

Tip: check the official list provided by your planning department. Some local authorities may ask for additional documents (soil survey, environmental impact statement, etc.). It's better to have too much information than too little!

Processing times for your swimming pool application

How long before the decision

  • File review

Once your application has been submitted, the local authority will start the application process.

The duration generally varies from a few weeks à several monthsdepending on the complexity of the project.

  • Any requests for additional information

If any documents are missing, the local authority may contact you again.

This process can lengthen lead times, so we might as well preparing your application from the outset.

  • Outpatient consultations

Certain projects (swimming pools on sloping ground, protected areas, etc.) must be approved by other departments (environment, national monuments, etc.).

Anticipate this obligatory step by adding the necessary supporting documents (soil study, landscape impact, etc.) to the dossier.

Tip: contact the town planning department before submitting your application. They will be able to tell you whether your project requires special consideration or additional documentation. This is the key to avoid blockages and speed up the procedure.

Making it easier for you

Prepare your administrative procedures

  • Prepare a complete dossier from the outset

List all the documents required by your local authority.

Check twice rather than once: it's better to have too much detail than too little.

  • Anticipate potential obstacles

Is your garden on a slope? Plan a small soil survey.

Are you in a protected area? Contact the relevant authorities to avoid rejection.

  • Communicate with your neighbours

Informing your neighbours reduces the risk of disputes.

Show them your plans and explain the noise impact (filtration pump, building work, etc.).

  • Consult a professional

Architects and pool designers: they are familiar with the regulations and standard files.

The result is a better-put-together dossier and significant time savings.

  • Keep an eye on your calendar

Avoid submitting your application just before the summer holidays: administrative services can sometimes be slow.

Plan your site, taking into account possible delays (requests for additional information, possible appeals, etc.).

Tip: use the checklists available from your local council or on its website. By following their instructions step by step, you can maximise your chances of obtaining a rapid and favourable response.

What next?

Start building your swimming pool in Luxembourg

  • Starting work

As soon as you have the go-ahead from the local authority (planning permission or authorisation), you can start planning the work.

Think about display the official decision on your land, if required by your local authority, to inform neighbours.

  • Follow-up

Keep an eye on compliance: the pool must comply with the approved plans.

If you change your project along the way (size, location, etc.), let the authorities know as soon as possible.

  • Possible checks

The local authority may carry out an inspection to check that your project corresponds to the approved application.

If you fail to comply, you risk penalties (fines, obligation to comply, etc.).

  • Declaration of completion

Once the pool has been completed, some local authorities require a declaration of completion.

This formality allows them to close the file and ensure that everything is in order.

Tip: don't forget safety

Even when all the administrative formalities have been completed, it is still necessary to primordial respect safety measures (fence, alarm, cover). Accidents do happen, so make sure you protect access to the pool, especially if you have young children around.

To remember:

  • Check your local authority's regulationsEach locality in Luxembourg can have its own rules (distances, heights, etc.).
  • Opt for a complete fileplans, photos, descriptive note... the more precise you can be, the better.
  • Anticipate deadlinesPlease allow several weeks (or even months) before obtaining your authorisation.
  • Don't neglect safetyAlarm, barrier, cover... accident prevention is essential.
  • Ask a professionalA swimming pool specialist or architect can save you time and avoid mistakes.

Once you've taken the necessary steps, all you have to do is find the right best swimming pool specialist in Luxembourg !

en_GB